Brunacci Residence Progress | Update 2

March 2014

Progress on the foundations is well underway, with the lower ground floor slab now poured and excavation work commenced on the ground floor slab. The ground floor slab will be partly founded in the ground and partly a suspended concrete slab supported by pre-cast concrete walls which are currently being fabricated 300km away. The transportation and erection of the pre-cast panels will commence in the next fortnight.

Site Progress Diary:

Compacted gravel was built up over a layer of concrete blinding to form the reinforced concrete foundation beams

MJ Architecture | Foundation Overview

Overview of lower ground floor slab being prepared for pouring. Extent of reinforced concrete foundation beams are visible

Continue reading

Martin House Near Completion

Our Martin House is nearing completion!

MJ Architecture - Martin House Kitchen in progress

Kitchen construction in progress

Located at Princes St, Launceston the design narrative of this house was driven by the creation of small and intimate spaces, both inside the home and in the garden. As the site is a small urban block and space is at a premium, strong visual links have been created, bridging the inside and outside and essentially extending the sense of internal space out into the gardens

Continue reading